Portable load bank connected by heavy cables to a standby generator at dusk
  1. Home
  2. Services
  3. Load bank testing
Load bank and building testing

Proof your generator can carry the building. On paper.

Load bank and building testing to NFPA 110, with the numbers recorded for your compliance file and your fire department.

Starting is not the same as carrying load.

Load bank trailer cabled to a generator for a load test

Most standby generators get exercised lightly. They start, they idle, they shut down. That proves the engine turns over. It doesn’t prove it can carry your building for hours.

A load bank gives the generator a real, controlled workload. A building test moves your actual facility onto it. Either way you find out what happens under load on a calm day, not in the middle of an outage. Generators that run lightly for long stretches can also build up unburned fuel in the exhaust, and a proper load run helps clear it.

What you get

  • A controlled load test. The generator run at real working load, stepped and monitored.
  • Building testing. Your facility moved onto generator power so the whole system is proven together.
  • Recorded readings. What the unit did under load, written down.
  • NFPA 110 documentation. Ready for your compliance file and annual fire department reporting.

Load bank and building testing are included in the Standby Agreement.

Need a one time test for an inspection? Call and ask.
Free site walkthrough

Know your backup will catch.

I’ll come out, look at your equipment, and tell you exactly where you stand. No cost, no obligation, no sales pitch.

(530) 704-0711

Thanks. Your email app should open with the details filled in. In a hurry? Call (530) 704-0711.

Goes straight to Stephen. Never shared, never added to a list.

Call StephenWalkthrough